One screen across gas and power: latest SIN gas generation, SE PLD and CMO, disclosed ANP and POC prices, pipeline utilization, and a client-side thermal spark calculator. Product pages keep filters and full history.
PLD vs CMO vs gas CVU — SE
Last ~90 days, Southeast. CMO and median gas-plant CVU from ONS (R$/MWh). CVU is a planning cost, not a market price.
Thermal spark / implied CVU i
Implied generation cost from gas price and heat rate, compared with current PLD SE and CMO SE. Optional CVU override replaces the calculated cost.
POC vs ANP — monthly
Mean POC auction price vs ANP Santos producers and non-thermal Sudeste distributors (R$/MMBtu).
Contracted capacity vs realized flows
Active contracted capacity (thousand m³/d) vs average realized volume over the last 30 days of flow data, by TSO.